ALLOT TECH | BEVERAGE EQUIPMENT RFQ CHECKLIST Editable buyer working document | Revision 2026-09-14 Companion guide: https://allottech.com/beverage-systems/bottled-water-filling-lines/ Use: Replace each blank with a requirement, an open question or "not applicable". Keep the same revision when requesting comparable proposals. This blank record does not approve a machine, guarantee output or create an order commitment. PROJECT CONTROL Project / company: Prepared by / date / revision: Decision owner: Destination / delivery boundary: Required proposal date / target start date: 1. PRODUCT AND PROCESS Beverage and recipe family: Source-water report ID / product-water target: Approved process basis / responsible process specialist: Filling conditions / cleaning requirements: Files supplied, revision and items still open: 2. CONTAINER AND CLOSURE (COMPLETE FOR EACH FORMAT) Format ID / material / nominal fill volume: Bottle height / diameter / neck drawing and revision: Cap type / closure drawing / approved physical samples: Label / code / finished pack: Bottle supply: purchased empty bottles / in-house blowing / existing blower: Format changeover requirements: 3. OUTPUT BASIS Required good units per hour for the named reference format: Shift length / planned production time / daily or annual target: Other formats and required rates: Trial product / bottle / cap / operating conditions for rated output: Required reject, fill and closure acceptance criteria: Do not treat catalog BPH as guaranteed finished-line output. 4. EQUIPMENT AND INTERFACES Included treatment, tanks, filling, labeling, inspection and packing: Buyer-supplied or existing equipment with measured running rates: Transfer, controls, mechanical and electrical interface owners: Options / exclusions / approved components: 5. SITE AND UTILITIES Layout drawing / room dimensions / service clearances / access: Power supply and connection point: Compressed air, water, cooling, steam and drainage as applicable: Available utility quality / pressure / flow / demand basis: Local contractor scope and unresolved site work: Ask for a complete utility schedule; one machine's listed power is not plant demand. 6. VERIFICATION AND HANDOVER FAT location / test materials / methods / records / approvers: SAT conditions / local installation / commissioning responsibilities: Open-item closure process / acceptance and release decision: Drawings / manuals / software backup / spare parts / operator training: 7. COMPARABLE COMMERCIAL RESPONSE Supplier proposal ID / date / revision: Itemized included scope, options and exclusions: Delivery term and named place / packing / freight boundary: Schedule assumptions / payment milestones / validity: Installation, training, warranty and support scope to be confirmed: OPEN QUESTIONS AND ACTIONS (REPEAT AS NEEDED) Question ID: Requirement or discrepancy: Responsible party / evidence needed / due date: Status: open / answered / accepted / not applicable: Approved change / approver / date: NEXT STEP Prepare an online summary: https://allottech.com/project-brief-builder/ Discuss the confirmed project: https://allottech.com/contact/?project=beverage